Coventry Curve 2 is a residential complex by developer GFS Developments, located in Dubai Industrial City, Dubai.
The building includes a basement floor, a ground floor, six residential floors and a roof. The project includes studios and apartments with 1-2 bedrooms.
The exterior of the complex is distinguished by its elegance and modern design, representing a double arcade, mirroring Coventry Curve 1, with a symmetrical facade and a visual mirror effect. The complex is decorated with two main entrances, two fountains with landscaped gardens at the entrance and four high-speed elevators. The architecture focuses on maximizing the use of natural light and optimizing views. The interiors of the apartments are distinguished by their thoughtful design.
Residents have access to a running track, a playground, outdoor recreation areas, a swimming pool, a gym, lounge areas, a campfire and barbecue area, as well as a meditation area.
The project is located 10-15 minutes from Dubai Hills Mall, Dubai Marina, JLT, Mall of the Emirates. Downtown Dubai, Burj Khalifa and Dubai Mall can be reached in 15-20 minutes. IMG Worlds of Adventure, Dubai International Airport and Global Village can be reached in 25-30 minutes.
EOI: 7.5%
The launch date will be announced later
Property details
Property type
apartment
Bedrooms
1, 2
Size
680 – 892 sqft
Furnishing
semi furnished with kitchen appliances
Completion
off plan
Handover
Q1 2028
Ownership
freehold
Parking
1
Service charge
12 AED / sqft / year
Unit types
apartment
Project
GFS DEVELOPMENTS "Coventry Curve 2" NEW LAUNCH
Listing type
sale
Record type
project
Building 1 · B+G+6+R
Amenities
Adults Pool
Arbour
BBQ
Children’s pool
Covered gym
Fountain
Indoor Multipurpose Space
Jogging tracks
Kids Play Area
Kids splash pad
Landscaped garden
Leisure areas
Layouts & floor plans
1 BR
AED 908,700 – 950,640
2 BR
AED 1,084,837
Payment plan
Payment Plan (36 months post handover)
Post Handover
20% down payment · Post-handover
5%On booking
15% + 4% DLD + 3000 AED Admin FeeIn May 2026
19% (1% per month)From June 2026 to December 2027
25%On completion
36% (1% per month)Post handover from February 2028 to January 2031